![]() |
Tes-Khem District Adopted its 7-year Development Plan |
Dina Oyun 24 Fabruary 2008 permanent link: https://en.tuvaonline.ru/2008/02/24/0541_tes.html |
Tes-Khem district of Tuva which borders Mongolia adopted a complex socio-economic development plant for the period till 2015. It makes a stress on the external economic links of the district, cattle-breeding, solution of the energy lack problems. Two electric power stations could be built within the next 10 years in Tes-Khem. The first station will be a small hydroelectric power stations on the Tes River. The second station, wind-power, could be built in the settlement of Shuurmak.
© 2001-2025, "Tuva-Online" News & Information Agency (www.tuvaonline.ru). Republishing, redistributing or syndicating without direct reference to Tuva-Online is prohibited |